• BKI: Power in Partnership
  • Contact Us
  • 1+360-687-3966
  • Home
  • Your Team
  • Services
  • Projects
    • Planning
    • Transmission
    • Distribution
    • Substation
    • Generation
  • Partners
  • BKI Blog
  • Careers
  • Contact BKI
Bid Center
Tallinn
  • Home
  • Your Team
  • Services
  • Projects
    • Planning
    • Transmission
    • Distribution
    • Substation
    • Generation
  • Partners
  • BKI Blog
  • Careers
  • Contact BKI

2018 October

  • Home
  • Archive for October, 2018
19
Oct

Evaluating Equipment Power Losses

  • By Scott Lindsay
  • 0

By Erik Kysar, P.E., and Guy Colpron, P.E. For decades, low-cost hydropower caused utilities (large and small) to largely ignore the cost of losses. Today, rising wholesale costs, especially with the onset of tier 2 rates, place a large emphasis in loss reduction and loss evaluation. Unlike consumer energy efficiency, reduced system losses contribute directly

Tallinn
Serving Public Utilities in the West Since 1985

Contact Us

  • 201 NE Park Plaza Dr Ste. 293 Vancouver, WA 98684
  • Office: 1+360-687-3966
  • Email: bki@bki.cc

BKI Blog

Seismic Resiliency Consideration for Utilities By Scott Howard, P.E., Waypoint Seismic and BKI Engineering Services ...
Oct 28, 2022
By Scott Howard, PE, Principal of Waypoint Engineering and Peter Grushevskiy, EIT, Civil Engineering, Environmental ...
May 20, 2020

BKI Services

BKI, Brown & Kysar provides practical
BKI, Brown & Kysar provides practical
BKI, Brown & Kysar provides practical
BKI, Brown & Kysar provides practical
BKI, Brown & Kysar provides practical
BKI, Brown & Kysar provides practical
Copyright © 2017. All Rights Reserved By BKI, INC